Derby is a vibrant city that is proud of its heritage, and is widely considered to be the birthplace of the Industrial Revolution.
There are many buildings across the city and beyond from years ago that tell stories about times gone by.
Many of these architectural gems have been preserved with care. Some buildings and spaces however are at risk due to significant challenges such as a squeeze on finances or weathering inclement climates that has led the space to become neglected or fall into decay.
In a bid to shine a spotlight on these at-risk places, Historic England has released a list of buildings, complexes and spaces in Derby.
Losing these sites would be considered a loss for local communities in Derby.
Take a look below at these historic at-risk buildings:

1. Church of All Saints, Lower Road, Mackworth
Historic England has released a list of at-risk places in and across Derby. Pictured is Church of All Saints in Mackworth. | Ian S, CC BY-SA 2.0 <https://creativecommons.org/licenses/by-sa/2.0
_(31490123716).jpg?crop=4:3&trim=&width=800)
2. Church of St Thomas the Apostle, Pear Tree Road
This is a Grade II Listed building | The National Churches Trust, CC BY 2.0 <https://creativecommons.org/licenses/by/2.0>, via Wikimedia Commons

3. Darley Abbey Mills (North Complex) preparation building, cottage, workshop and cart sheds, Old Lane, Darley Abbey
This is a Grade II Listed complex | David Smith / The Old Fire Station in the mill complex at Darley Abbey

4. Horsley Castle Remains, Horsley
The heritage category for this is Scheduled Monument. This makes it a nationally important archaeological site designated by Historic England. | John Poyser / Overgrown Remains of Horsley Castle
